Data Centres
Clean-agent suppression upgrade for a colocation data hall
- Cut-over
- Staged
- Audit support
- Handover pack
- Design basis
- Calculated
Sector
Data Centres
Problem
An ageing CO₂ system protected a live colocation hall, creating a personnel-safety risk and falling short of a tenant compliance review.
System involved
Gaseous suppression (SANS 14520) with addressable detection (SANS 10139) and HVAC interlock.
Intervention
Phased cut-over to an FM-200 clean-agent system with cross-zoned detection, room-integrity (fan) testing and an HVAC shutdown interlock — planned to keep the hall in service throughout.
Outcome
Handover pack prepared to support the tenant compliance review; a personnel-safe clean agent with a documented design-concentration calculation, and a cut-over staged to limit disruption to the live hall.
Documentation
- Room-integrity test certificate
- SANS 14520 design concentration calculation
- As-built detection zone drawings
- Commissioning and handover pack
Representative scenario — not a named client or measured project result. Replace with approved project evidence before using as a real case study.